{"id":18091,"date":"2021-08-30T16:08:37","date_gmt":"2021-08-30T13:08:37","guid":{"rendered":"https:\/\/ae.mashroo3k.com\/studies\/%d9%85%d8%b5%d9%86%d8%b9-%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d8%a9-g-r-c\/"},"modified":"2024-05-26T19:00:29","modified_gmt":"2024-05-26T16:00:29","slug":"%d9%85%d8%b5%d9%86%d8%b9-%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d8%a9-g-r-c","status":"publish","type":"studies","link":"https:\/\/ae.mashroo3k.com\/en\/studies\/%d9%85%d8%b5%d9%86%d8%b9-%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d8%a9-g-r-c\/","title":{"rendered":"G.R.C Factory"},"content":{"rendered":" <div class=\"content-card study-summary\">\n    <!-- Grid -->\n    <div class=\"row no-gutter\">\n        <!-- Media -->\n        <div class=\"col-12 col-m-5\">\n                    <a href=\"#\" data-title=\"G.R.C Factory \" class=\"responsive-element media-element \" data-src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2024\/05\/unnamed-1-1.jpg\"><\/a>\n        <\/div>\n        <!-- Content -->\n        <div class=\"col-12 col-m-7 rich-content\">\n            <h2>G.R.C Factory <\/h2>\n                        <p>The G.R.C Factory is an industrial endeavor dedicated to producing Glass Fiber Reinforced Concrete (G.R.C). This concrete stands out for its strength, rigidity, and exceptional resilience against diverse weather conditions, alongside its ease of malleability and application. It finds application in the decoration, as well as exterior and interior designs of villas, palaces, mansions, and large-scale buildings. This renders it the optimal choice across all construction styles, boasting superior performance and exceptional aesthetics.<\/p>\n            <p><\/p>\n        <\/div>\n        <!-- Info Bar -->\n        <div class=\"col-12 col-m-7 info-bar flexbox\">\n            <!-- Item -->\n            <h3 class=\"info-item col-auto\">Capital  <strong data-counter=\"7500000\" data-sign=\" AED\"><\/strong><\/h3>            <!-- Item -->\n            <h3 class=\"info-item col-auto\">Rate of Return <strong data-counter=\"37\" data-sign=\"%\"><\/strong><\/h3>            <!-- Item -->\n                        <!-- Item -->\n                        <!-- Item -->\n                        <!-- Item -->\n            <h3 class=\"info-item col-auto\">Payback Period <strong >Third year <\/strong><\/h3>        <\/div>\n        <!-- Info Bar -->\n    <\/div>\n    <!-- \/\/ Grid -->\n<\/div>\n\n\n\n<div class=\"wp-block-tornado-description-sec alignfull content-card study-benifites\"><div class=\"row row-reverse\"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2024\/05\/unnamed-1-1.jpg\" alt=\"Description of G.R.C Factory \" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Description of G.R.C Factory <\/h2><p>The G.R.C Factory is an industrial endeavor dedicated to producing Glass Fiber Reinforced Concrete (G.R.C). This concrete stands out for its strength, rigidity, and exceptional resilience against diverse weather conditions, alongside its ease of malleability and application. It finds application in the decoration, as well as exterior and interior designs of villas, palaces, mansions, and large-scale buildings. This renders it the optimal choice across all construction styles, boasting superior performance and exceptional aesthetics<\/p><p>Mashroo3k for Economic Consulting provides tailored feasibility studies for entrepreneurs considering investment in the G.R.C Factory, relying on an extensive database encompassing all facets of the target market.This study facilitates well-informed investment decisions by providing precise projections of project feasibility and a thorough comprehension of potential opportunities, challenges, and risks. These encompass environmental, legal, operational, and financial considerations, ensuring a holistic assessment for investors<\/p><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-tornado-project-justifications alignfull content-card study-benifites\"><div class=\"row \"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2024\/05\/unnamed-1-1.jpg\" alt=\"Project products\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Project products<\/h2><ul class=\"chelist\"><li>G.R.C Factory<\/li><\/ul><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-tornado-project-justifications alignfull content-card study-benifites\"><div class=\"row \"><div class=\"col-12 col-m-4\"><img decoding=\"async\" src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2021\/12\/01.png\" alt=\"Discover what sets Mashroo3k apart\" class=\"fluid\"\/><\/div><div class=\"col-12 col-m-8 rich-content\"><h2>Discover what sets Mashroo3k apart<\/h2><ul class=\"chelist\"><li><strong>\u2022 Financing approval: <\/strong> Mashroo3k is approved by all funders in the Kingdom of Saudi Arabia, Egypt, Oman, and Qatar.<\/li><li><strong>International research expertise<\/strong>: Mashroo3k has a strong network of connections with many institutions and companies specialized in marketing consulting and market research. Mashroo3k is a member of the European Society for Opinion and Market Research ESOMAR, and builds its database in compliance with the top websites ESOMAR ANA \u2013 OEC \u2013 Statista \u2013 Unicef Data \u2013 WITS_ ITC.<\/li><li><strong>Services geographic coverage<\/strong>: Mashroo3k has a team of experts covers 20 countries in the GCC: Saudi Arabia &#8211; Kuwait &#8211; Qatar &#8211; United Arab Emirates &#8211; Bahrain &#8211; Oman &#8211; Yemen &#8211; Jordan &#8211; Iraq &#8211; Armenia &#8211; Indonesia &#8211; Syria &#8211; Turkey &#8211; Georgia &#8211; Romania &#8211; Egypt &#8211; Sudan &#8211; Libya &#8211; Somalia &#8211; Algeria &#8211; Djibouti &#8211; Mali.<\/li><li>\u2022 <strong>Mashroo3k`s<\/strong> international memberships: Mashroo3k has obtained more than 30 international memberships, in addition to ISO.<\/li><li><strong>Mashroo3k is a business partner and service provider for the world\u2019s top companies and international entities<\/strong>: Such as United Nation Global, PWC\u0648Accenture<\/li><\/ul><\/div><\/div><\/div>\n\n\n<!-- Study Benifites -->\n<div class=\"content-card study-benifites tabs\">\n    <!-- Tabs Menu -->\n    <ul class=\"tabs-menu head\">\n                <li data-tab=\"tab-1\">Project Features<\/li>                <li data-tab=\"tab-2\">Study Contents<\/li>                <li data-tab=\"tab-3\">Sector Indicator<\/li>                <li data-tab=\"tab-4\">The project as an investment opportunity<\/li>    <\/ul>\n    <!-- Tabs Wraper -->\n    <div class=\"tabs-wraper\">\n        <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-1\">\n            <!-- Grid -->\n            <div class=\"row row-reverse\">\n                <!-- Media -->\n                <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2024\/05\/unnamed-1-1.jpg\" alt=\"\u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0642\u0637\u0627\u0639\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <ul>\r\n<li>The production capacity is substantial.<\/li>\r\n<li>An experienced team is ready to collaborate.<\/li>\r\n<li>Products adhere to international quality standards.<\/li>\r\n<li>State-of-the-art technology is employed in manufacturing.<\/li>\r\n<li>The administrative team harbors ambitious plans.<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-2\">\n            <!-- Grid -->\n            <div class=\"row\">\n                <!-- Content -->\n                <div class=\"col-12 col-m-6 rich-content\">\n                    <p><strong>Executive Summary<\/strong><\/p>\r\n<ul>\r\n<li>Project Overview<\/li>\r\n<li>Financial Indicators<\/li>\r\n<li>Project justification<\/li>\r\n<li>Government investment incentives for the project<\/li>\r\n<li>Target Markets<\/li>\r\n<li>Final indicators and outcomes of the project<\/li>\r\n<\/ul>\r\n<p><strong>Project Service\/Product Study<\/strong><\/p>\r\n<ul>\r\n<li>Description of the project and all its services\/products<\/li>\r\n<li>Project advantages and production requirements<\/li>\r\n<\/ul>\r\n<p><strong>Market Size Study<\/strong><\/p>\r\n<ul>\r\n<li>Familiarity with distribution channels<\/li>\r\n<li>Consumers\u2019 behavior, desires, and habits<\/li>\r\n<li>Competitors\u2019 products or services and their strengths and weaknesses <\/li>\r\n<li>The nature and attributes of the market<\/li>\r\n<li>The size of the demand for a product or service<\/li>\r\n<li>The available share of the target market<\/li>\r\n<li>The optimal method of marketing<\/li>\r\n<\/ul>\r\n<p><strong>Study of Risks<\/strong><\/p>\r\n<ul>\r\n<li>Identifying the risks<\/li>\r\n<li>Risks\u2019 impact on the project<\/li>\r\n<li>Methods of risk prevention<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n                <!-- Content -->\n                <div class=\"col-12 col-m-6 rich-content\">\n                    <p><strong>Technical Study<\/strong><\/p>\r\n<ul>\r\n<li>A detailed description of the project\u2019s products, the expected production capacity, and identifying investment costs<\/li>\r\n<li>Identifying the size of electrical and water power<\/li>\r\n<li>Identifying the project\u2019s employment<\/li>\r\n<li>Identifying the project\u2019s requirements<\/li>\r\n<li>Estimating construction costs<\/li>\r\n<li>Estimating the total capital<\/li>\r\n<li>Estimating annual operating costs<\/li>\r\n<li>Estimating the amount of operating capital<\/li>\r\n<\/ul>\r\n<p><strong>Financial Study<\/strong><\/p>\r\n<ul>\r\n<li>The total required investment costs of the project<\/li>\r\n<li>Structuring the income statement, cash flow statement, and balance sheet of the first ten years of operation<\/li>\r\n<li>Estimating the expected annual revenues of the project in light of the identified operating capacities<\/li>\r\n<li>The optimal funding structure of the project in light of the investors\u2019 capabilities and funding terms<\/li>\r\n<li>The project financial indicators and sensitivity analysis<\/li>\r\n<\/ul>\r\n<p><strong>Regulatory and Administrative Study<\/strong><\/p>\r\n<ul>\r\n<li>The project workforce<\/li>\r\n<li>Regulatory structure<\/li>\r\n<li>Job duties<\/li>\r\n<\/ul>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-3\">\n            <!-- Grid -->\n            <div class=\"row row-reverse\">\n                 <!-- Media -->\n                 <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2021\/12\/\u0645\u0635\u0646\u0639-\u0627\u0644\u0637\u0627\u0628\u0648\u0642-\u0627\u0644\u0639\u0627\u0632\u0644-\u0627\u0644\u062d\u0631\u0627\u0631\u064a-copy-2.jpg\" alt=\"\u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0643\u0641\u0631\u0635\u0629 \u0627\u0633\u062a\u062b\u0645\u0627\u0631\u064a\u0629\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <p>Given to the significance of such sector, Mashroo3k is pleased to show you the following key indicators in the GCC countries:<\/p>\r\n<ul>\r\n<li><strong>The Kingdom of Saudi Arabia<\/strong><strong>:<\/strong><\/li>\r\n<\/ul>\r\n<p> The GDP value of building and construction sector in Saudi Arabia is estimated at SAR 168,750 million.<\/p>\r\n<p>The sector contributes 48.2% to Saudi GDP.<\/p>\r\n<p>The number of companies operating in this sector is about 148,026.<\/p>\r\n<p>The number of workers in this sector is about 3,541,977.<\/p>\r\n<p>According to the latest statistics, the value of completed projects in the sector is SAR 311,563,369 thousand.<\/p>\r\n<p>Saudi Arabia comes first as the largest construction market in the region, with an annual market value surpassing USD 100 billion.<\/p>\r\n<ul>\r\n<li><strong>The United Arab Emirates<\/strong><strong>:<\/strong><\/li>\r\n<\/ul>\r\n<p>The GDP value of building and construction sector is estimated at AED 123,953 million.<\/p>\r\n<p>The sector contributes 8.3% to the GDP.<\/p>\r\n<p>The number of companies operating in this sector is about 42,428.<\/p>\r\n<p>The number of workers in this sector in the UAE is about 1,564,095.<\/p>\r\n<ul>\r\n<li>\u2022 <strong>Bahrain<\/strong><strong>:<\/strong><\/li>\r\n<\/ul>\r\n<p>The GDP value of building and construction sector is estimated at BHD 936.79 million.<\/p>\r\n<p>The sector contributes 7.70% to the GDP.<\/p>\r\n<p>In 2016, the sector value did not exceed BHD 857 million. However, within a few short years, the sector value has surged to BHD 945.51 million.<\/p>\r\n<ul>\r\n<li><strong>Oman<\/strong><strong>:<\/strong><\/li>\r\n<\/ul>\r\n<p>The GDP value of the sector is estimated at OMR 936.79 million.<\/p>\r\n<p>The sector contributes 6.7% to the GDP.<\/p>\r\n<p>The number of workers in this sector is about 548,999.<\/p>\r\n<p>Oman&#8217;s construction sector has the largest share of workforce, with (22.4% of all Omani workers in both private and public sectors).<\/p>\r\n<p>It also accounts for 29.6% of the total number of expatriate workers in the Sultanate.<\/p>\r\n<ul>\r\n<li><strong>Kuwait<\/strong><strong>:<\/strong><\/li>\r\n<\/ul>\r\n<p>The GDP value of building and construction sector is estimated at KWD 838.9 million.<\/p>\r\n<p>The sector contributes 2.14% to the GDP.<\/p>\r\n<p>The number of companies operating in this sector is about 1502.<\/p>\r\n<p>The number of workers in this sector is about 187,705.<\/p>\r\n<ul>\r\n<li><strong>Qatar<\/strong>:<\/li>\r\n<\/ul>\r\n<p>The GDP value of building and construction sector is estimated at QAR 81,215 million.<\/p>\r\n<p>The sector contributes 12.1% to the GDP.<\/p>\r\n<p>The number of companies operating in this sector is about 5,629.<\/p>\r\n<p>The number of workers in this sector is about 840,999.<\/p>\r\n<p>Over 40% of economically active people works in construction.<\/p>\r\n<p>The building and construction sector holds great promise, The expanding population and ongoing infrastructure developments across many countries are positioning this sector as a key focus for investors and entrepreneurs aiming for substantial returns with Experts are expected the construction market to grow up to 4.2% in three years, as the indicators shows that the value of this market will surge up to USD 10.5 % trillion by 2023<\/p>\r\n<p>The <strong>global building<\/strong> and construction outputs 10.7 trillion in 2020. This output is expected to experience significant growth of 42% (USD 4.5 trillion) between 2020 and 2030, reaching a significant value of USD 15.2 trillion by the end of the decade. <strong> <\/strong><\/p>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- Tab Content -->\n                <div class=\"tab-content\" id=\"tab-4\">\n            <!-- Grid -->\n            <div class=\"row\">\n                <!-- Media -->\n                <div class=\"col-12 col-m-4\">\n                    <img decoding=\"async\" src=\"https:\/\/ae.mashroo3k.com\/wp-content\/uploads\/2021\/09\/\u0627\u0644\u0641\u0631\u0635-\u0627\u0644\u0627\u0633\u062a\u062b\u0645\u0627\u0631\u064a\u0629.jpg\" alt=\"\u0645\u0624\u0634\u0631\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639\" class=\"fluid\">\n                <\/div>\n                <!-- Content -->\n                <div class=\"col-12 col-m-8 rich-content\">\n                    <p>The building and construction sector accounts for 13% of the global GDP, as well as it\u2019s expected to reach 13.5% by 2030. According to the latest statistics, infrastructure will be the fastest-growing subsector within the construction sector, with an anticipated growth rate of 4% between (2020 and 2030).<\/p>                <\/div>\n                <!-- \/\/ Content -->\n            <\/div>\n            <!-- \/\/ Grid -->\n        <\/div>\n                <!-- \/\/ Tab Content -->\n    <\/div>\n    <!-- \/\/ Tabs Wraper -->\n<\/div>\n<!-- \/\/ Study Subjects -->\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":12803,"template":"","studies-categories":[43],"studies-tags":[882],"class_list":["post-18091","studies","type-studies","status-publish","has-post-thumbnail","hentry","studies-categories-construction-sector","studies-tags-g-r-c-factory"],"_links":{"self":[{"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/18091","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies"}],"about":[{"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/types\/studies"}],"version-history":[{"count":5,"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/18091\/revisions"}],"predecessor-version":[{"id":20554,"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies\/18091\/revisions\/20554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/media\/12803"}],"wp:attachment":[{"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/media?parent=18091"}],"wp:term":[{"taxonomy":"studies-categories","embeddable":true,"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies-categories?post=18091"},{"taxonomy":"studies-tags","embeddable":true,"href":"https:\/\/ae.mashroo3k.com\/en\/wp-json\/wp\/v2\/studies-tags?post=18091"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}